The Minimum Foundation Program and the State School Building Authority are frequently referenced in this blog.
The combination of the two programs were among the biggest influences in education, along with, but not limited to, free textbooks, the Quality Basic Education Act and the train of technology in its various forms.
Georgia’s plans in the 1950s to streamline its education, to get the most bang for its bucks, changed the fabric of schools, especially at the high school level.
Whereas states like Texas are seemingly content to maintain tiny high schools – Dave Campbell’s Texas Football was able to rattle off 10 high schools in 2016 with enrollments of 35 or less playing high school football at some level – Georgia frowned upon that. In 1953, Tift County’s Omega High lost its accreditation from the state because it had fewer than 60 students in its top four grades. Public high schools in Georgia have only gotten bigger since.
In the 1950s, schools consolidated at a rapid pace, into existing buildings that had enough room; into existing buildings with additions; or into completely new buildings because of a much larger student load and/or the inadequacy of the already existing buildings.
The Brewton School saga involved the third of these types of building projects. The State Board of Education and the Laurens County Board of Education decided to consolidate Brewton’s students into the new East Laurens school building.
But Brewton had a decent school building and no one wanted to see it go to waste. Officials planned on solving more consolidation with it, namely the consolidation of a section of Laurens County’s black students.
This plan went haywire.
Continue reading “Brewton School saga , Part I: Brewton and her school”
Like this:
Like Loading...